Facade Engineering for Commercial Buildings: How Curtain Walls, Glazing and Cladding Are Designed and Sealed in Texas

A multi-story concrete building under construction with glass curtain wall panels installed on the lower floors and open frame above

Curtain wall going up floor by floor on a hospital building. The anchors at each slab edge carry the wind and dead load of the panels back into the structure. (Photo: Prosperity Horizons, CC BY-SA 4.0, via Wikimedia Commons · CC BY-SA 4.0 · cropped and resized)

Facade engineering is the design of a building's outer skin so it carries wind and its own weight back to the structure, keeps water out, and moves with the frame without cracking glass or popping panels. On a commercial project that means curtain walls, storefronts, glazing, metal and composite panels, stone and precast cladding, and the anchors that tie them to the slab edges and columns. Wikipedia's entry on the subject notes that facades are among the most expensive and highest-risk elements of a major project, and historically the part of the building fabric with the most failures.

Owners and architects mostly need to know what the code requires the facade to resist, how stiff its framing must be, and which engineer signs for which part.

What does a facade engineer do?

On a typical commercial building, the work splits into a few tasks:

  • Set the design loads for the cladding: wind pressures for components and cladding, dead load, and seismic where it applies.
  • Check the glass, mullions, panels and their connections against those loads and against deflection limits.
  • Design or review the anchors and embeds at the slab edges, and check that the building structure can take the anchor loads and that its own deflection won't crush or rack the facade.
  • Review the facade contractor's shop drawings and calculations.
  • Watch the weather-resistance details (flashing, drainage paths, sealant joints) that turn a strong wall into a dry one.

Large firms run dedicated facade groups for towers and complex custom systems. On most low- and mid-rise commercial, school and municipal buildings, the work is shared between the structural engineer of record and the specialty engineer who works for the curtain wall or panel contractor.

The code path for a facade: loads and glass

The 2021 IBC (§1609.1.1) requires wind loads on every building to be determined under Chapters 26 to 30 of ASCE 7, with wind assumed to come from any horizontal direction and pressures acting normal to the surface. Facade elements are designed for the components and cladding pressures, which are higher near corners and roof edges than the pressures used for the main frame.

For glass, IBC §2404.1 applies:, vertical glass (sloped 15 degrees or less from vertical) in windows, curtain walls, storefronts and doors must be designed for the components and cladding wind loads from §1609. The load resistance of the glass is determined under ASTM E1300. Glass in glazed curtain walls and storefronts also has to meet the seismic requirements of ASCE 7 §13.5.9.

Where one or more sides of a pane aren't firmly supported, as in structural glass fins, point-supported glass or butt-glazed corners, §2403.2 requires detailed construction documents, shop drawings, and analysis or test data from a registered design professional.

ASCE 7-22 adds a tornado chapter. ASCE describes the criteria as defending against tornadic winds of up to about 135 mph. Whether it applies to your project depends on the code edition and amendments your city has adopted, so ask the building department early on a school, hospital or emergency facility in North Texas.

Deflection limits that size the framing

Facade framing is often governed by stiffness, not strength. The IBC sets these limits:

ElementLimitCode
Framing supporting glass, span up to 13 ft 6 inL/175 under 0.6 x components and cladding wind loadIBC §1604.3.7
Framing supporting glass, span over 13 ft 6 inL/240 + 1/4 in under 0.6 x components and cladding wind loadIBC §1604.3.7
Glass edge support ("firmly supported")Same L/175 or L/240 + 1/4 in limits on edge deflectionIBC §2403.3
Exterior walls with plaster or stuccoL/360 under windIBC Table 1604.3
Exterior walls with other brittle finishesL/240 under windIBC Table 1604.3
Exterior walls with flexible finishesL/120 under windIBC Table 1604.3
Secondary wall members supporting formed metal sidingL/90 under design windIBC Table 1604.3, note

A footnote to Table 1604.3 lets the designer take the wind load for these deflection checks as 0.42 times the components and cladding load, or calculate it directly from the 10-year wind speed. The glass-framing limits in §1604.3.7 still govern where framing supports glass.

The building's own movement matters too. Slab edges deflect under floor load, and floors drift sideways under wind. The facade joints and anchors have to take that movement, which is why the structural engineer of record should give the facade designer the expected slab-edge deflection and story drift in the contract documents.

Keeping water out

The IBC's weather protection section (§1402.2) requires a weather-resistant exterior wall envelope with flashing, a water-resistive barrier behind veneers, and a way to drain water that gets into the wall back to the outside. Concrete and masonry walls designed under Chapters 19 and 21 are exempt from the separate envelope requirement. Strength checks won't catch a missing end dam at a sill or a sealant joint too narrow for the movement it has to take, so the shop drawing review should cover drainage and joint sizing as well as the calculations.

Who designs and seals the facade in Texas?

Curtain walls and storefronts are usually delegated design: the architect and structural engineer of record set the performance requirements, and the facade contractor's engineer designs the system. Texas law makes the sealing rules clear.

  • Texas Occupations Code §1001.401 requires a plan, specification or report issued by a license holder for a project built in Texas to carry that engineer's seal.
  • TBPELS rule 22 TAC §137.33(g) says that when more than one license holder has worked on a plan or document, each one seals and signs it with a note describing the work done under their responsible charge.

In practice, that produces a split like this:

TaskUsually done by
Performance criteria: loads, drift, deflection limits, slab-edge movementStructural engineer of record, with the architect
Building structure and slab edges that receive anchorsStructural engineer of record
Curtain wall or panel system: mullions, glass, anchors, connectionsSpecialty engineer licensed in Texas, working for the facade contractor
Shop drawing and calculation review for conformance with the design intentArchitect and structural engineer of record
Field observation of anchors and installationEngineer of record and specialty engineer, as the contract assigns

Write the split into the specifications. Gaps show up when nobody is named for the anchor embeds or the steel that supports the facade at an opening.

Facade checklist for owners and architects

  • Confirm the code edition and local amendments, including whether ASCE 7-22 tornado provisions apply.
  • Put wind load criteria, drift and slab-edge deflection, and deflection limits for the facade in the contract documents.
  • Specify delegated design submittals: sealed calculations and shop drawings from a Texas-licensed engineer.
  • Flag any glass that isn't supported on all four sides for a §2403.2 design.
  • Coordinate embeds and supporting steel between the structural and facade drawings before the slabs are poured.
  • Review weather-resistance details (flashing, drainage, joint widths) alongside the structural calculations.
  • Plan construction observation of anchors before they're covered.

Talk to Isbell Engineering Consultants about facade engineering

Isbell Engineering Consultants lists facade engineering, including the design and analysis of curtain walls, glazing systems and cladding, among its structural engineering services, alongside structural design and construction phase services such as shop drawing review. For more on how the structural engineer fits into a commercial project, see what a structural engineer does. If you have a curtain wall, storefront or cladding package to design or review, send the project details through our contact page.

Frequently asked questions

What is facade engineering?

It's the engineering of a building's exterior envelope (curtain walls, glazing, cladding and their anchors) so it resists wind and other loads, stays within deflection limits, keeps water out and accommodates the building's movement.

What does a facade engineer do on a project?

They set or apply the facade design loads, check glass, framing, panels and connections, design or review anchors, review shop drawings and calculations, and help observe installation. On delegated-design projects, a specialty engineer working for the facade contractor often designs the system itself.

What wind load is a curtain wall designed for?

Components and cladding wind pressures under ASCE 7 Chapters 26 to 30, as the IBC (§1609.1.1) requires. Glass resistance is checked under ASTM E1300 (§2404.1).

How much can curtain wall framing deflect?

Under IBC §1604.3.7, framing that supports glass may deflect no more than L/175 for spans up to 13 feet 6 inches, or L/240 plus 1/4 inch for longer spans, under 0.6 times the components and cladding wind load.

Who seals curtain wall drawings in Texas?

Each engineer seals the work they're responsible for. Texas Occupations Code §1001.401 requires the seal on engineering documents for Texas projects, and TBPELS rule 137.33(g) requires each license holder on a shared document to seal it with a note of their work.

Sources

  1. 2021 IBC Chapter 16, Structural Design, §1604.3, Table 1604.3, §1609.1.1 (Texas, via UpCodes)
  2. 2021 IBC Chapter 24, Glass and Glazing, §2403.2, §2403.3, §2404.1 (Texas, via UpCodes)
  3. 2021 IBC Chapter 14, Exterior Walls, §1402.2 (Texas, via UpCodes)
  4. ASCE/SEI 7-22, Minimum Design Loads and Associated Criteria for Buildings and Other Structures (ASCE)
  5. Texas Occupations Code §1001.401, Use of Seal
  6. 22 Tex. Admin. Code §137.33, Sealing Procedures (TBPELS)
  7. Wikipedia, Façade engineering

Image credits

Copyright © 2026 Isbell Engineering Consultants - All Rights Reserved.